Monthly attendance sheet format where the days add up.

A monthly attendance sheet in Excel: a dropdown for every day, a late flag, holidays marked, and formulas for loss of pay and payable days. Filled here with September 2026 at Paiteq. On every row, payable days plus LOP make the 30 days of the month.

LekhaHR runs attendance, leave and payroll for small Indian teams from ₹59 per employee a month (₹99 for the first 25), payroll included, no minimum: it keeps this sheet from the punches themselves and carries LOP days into payroll.

What do P, A, HD, L, WO and H mean in attendance?

HD means a half day: the person was present for half the shift and had no leave for the other half, so it counts as half a paid day and half a day of LOP.

CodeMeansCounts as
PPresent1 paid day
AAbsent, unpaid1 day of LOP
HDHalf day: present for half the shift, with no leave for the other half0.5 paid · 0.5 LOP
LPaid leave1 paid day
WOWeekly off1 paid day
HHoliday1 paid day

LOP = A + 0.5 × HD · Payable = P + 0.5 × HD + L + WO + H

attendance-sheet-template · filled example

Attendance · September 2026

Paiteq Technologies · Bengaluru · 30 days · 21 working days

Month
Sep
Year
2026
Company
Paiteq Technologies

StatusPPresentAAbsent, unpaidHDHalf dayLPaid leaveWOWeekly offHHoliday

No.Name1Tu2We3Th4Fr5Sa6Su7Mo8Tu9We10Th11Fr12Sa13Su14Mo415Tu16We17Th18Fr19Sa20Su21Mo22Tu23We24Th25Fr26Sa27Su28Mo29Tu30WePresentHalf daysLateLOPA + 0.5 × HD1PayableP + 0.5×HD + L + WO + H2CheckPayable + LOP3
01Meenal JoshiPPPPWOWOPPPPPWOWOHPPPPWOWOPPPPPWOWOPPP210003030
Late?
02Asha RaoPPPPWOWOPPPLLWOWOHPPPPWOWOPPPPPWOWOPPP190003030
Late?
03Vikram Nair7PPPPWOWOPPPPPWOWOHPPPPWOWOPPPPPWOWOPPP210203030
Late?YY
04Rohan Das5PPPPWOWOPPPPPWOWOHPHDPPWOWOPPPPPWOWOPHDP192012930
Late?
05Priya MenonPPPPWOWOPPPPPWOWOHPPPPWOWOPPPPPWOWOPLL190003030
Late?
06Karthik IyerPPPPWOWOPPPPPWOWOHPPPPWOWOPA6PPPWOWOPPP200012930
Late?
Team119222178180
  1. 1because a full unpaid absence is a whole day of loss of pay and a half day is half of one: LOP = A + 0.5 × HD.
  2. 2because paid leave, weekly offs and holidays are paid days without a punch, and a half day pays half.
  3. 3because every day is either paid or loss of pay, so the two make 30. A smaller number means a day was left unmarked.
  4. 4because Mon 14 Sep, Ganesh Chaturthi, is a Karnataka holiday for the Bengaluru team, so it is H on every row.
  5. 5because Rohan's half days on 16 Sep and 29 Sep make 1 day of LOP in the calendar month. Payroll reads 26 Aug – 25 Sep, so only the 16 Sep half day reaches September pay.
  6. 6because Karthik took Tue 22 Sep without pay, so it is marked A: one day of LOP.
  7. 7because a late mark is a flag on a present day, so Vikram's two late days stay P and are counted on the Late? row.
Design preview · sample data · Paiteq Technologies · as at the close of Wed 30 Sep 2026

because a sheet you can check in one line (payable plus LOP equals the days in the month) is a sheet payroll can trust.

No. 02

How to use it

How do I fill in a monthly attendance sheet in Excel?

Set the month, year and company name, and mark weekly offs and holidays on the company calendar row. Then pick one status a day for each person: P, A, HD, L, WO or H. Present days, half days, late marks, LOP and payable days count themselves, and the check column must equal the days in the month.

  1. 1

    Set the month

    Pick the month, type the year and the company name. The day numbers and weekday labels follow, and short months hide the days they do not have.

  2. 2

    Mark the company calendar

    On the company calendar row, mark weekly offs WO and holidays H from your state and company holiday list. Copy the same marks onto each person's row.

  3. 3

    Mark each day

    P, A, HD or L for every working day. Leave without pay is A. A late arrival stays P, with Y on the Late? row under it.

  4. 4

    Read the summary, then check it

    Present, half days, late marks, LOP and payable days count themselves. The check column must equal the days in the month; if it is lower, a day is blank.

No. 03

Column by column

What should a monthly attendance sheet record?

One status for every person and every day, with late marks as a separate flag, the company's weekly offs and holidays, and the counts payroll needs: present days, half days, LOP days and payable days. The check column, payable days plus LOP, proves that every day of the month was marked.

Status dropdown
Every day cell offers P, A, HD, L, WO or H from a dropdown. A typed value outside the list is not blocked, so a stray word shows up as a check column short of the month.
Late? row
A Y/N row under each person. Late is a flag on a present day, not a seventh status.
Company calendar row
Weekly offs and holidays for the whole team. The working-days figure at the top comes from it.
Present and half days
Counts of P and HD. A half day is counted on its own, never as an absence.
LOP days
=COUNTIF(A) + 0.5 × COUNTIF(HD). The one column that turns attendance into loss of pay.
Payable days
P + 0.5 × HD + L + WO + H. Paid leave, weekly offs and holidays are paid. For daily-rated staff, whether a weekly off is paid depends on state law, so mark it A if yours is unpaid.
Check
Payable plus LOP. It equals the days in the month when every day is marked.
Holiday table
Date and name, below the grid. It ships empty: holidays differ by state and by company, and a list without a source would only mislead.

No. 04

The law behind it

How is loss of pay deducted from salary?

The deduction may not exceed the share of the month's wages that the days absent bear to the days the employee was required to work that month. That is the Code on Wages, 2019, s.20, in force since 21 Nov 2025. This template counts calendar days; a fixed 26-day divisor can over-deduct in a month with 27 working days.

A deduction for absence is capped: days absent ÷ days required to work
from 21 Nov 2025

Code on Wages, 2019, s.20 (deductions for absence from duty); earlier under the Payment of Wages Act, 1936 (repealed)

Paid days and deductions shown on a wage slip
from 21 Nov 2025

Code on Wages, 2019, s.50 and the Central Rules (notified 8 May 2026)

Holidays within annual leave, or prefixed or suffixed to it, are not counted as leave
from 21 Nov 2025

OSH Code, 2020, s.32, for the workers it covers

Holidays, casual and sick leave
set by each state

OSH Code, 2020, s.32 and each state's Shops & Establishments Act and rules

Read the loss of pay guide for the paid-day calculation, policy choices and a worked deduction. For next year's H days, take the dates from the holiday list 2027.

Code on Wages, 2019 and OSH Code, 2020, in force 21 Nov 2025 · checked by the LekhaHR team, 30 Sep 2026

No. 05

Common mistakes

Why doesn't my attendance sheet add up?

Usually because half days are missing from LOP, a holiday is left blank, unpaid leave is marked L, late marks were turned into pay cuts, or two months got mixed. Payable days plus LOP should equal the days in the month; a smaller number means a day was left unmarked.

  1. LOP that ignores half days

    Counting only A as loss of pay drops half of every half day. Payable plus LOP then falls short of the month. LOP is A + 0.5 × HD.

  2. Holidays left blank

    A blank holiday reads as a missing day. Mark it H, on every row.

  3. Unpaid leave marked L

    L is paid. Leave without pay is A, or it is paid by mistake.

  4. Late marks as pay cuts

    A late mark is a flag. Deducting for it needs a policy, and a deduction for absence is capped by the days actually absent.

  5. Two months mixed

    The sheet counts the calendar month. If payroll reads a cutoff window, days after the cutoff belong to next month's run.

No. 06

Sheets and limits

Can I use this attendance sheet in Google Sheets?

Yes. Import the .xlsx into Google Sheets and the dropdowns and COUNTIF formulas come with it. The steps take a minute; the limits below apply in Excel and in Sheets alike.

Import it into Google Sheets

  1. Download attendance-sheet-template.xlsx from this page.
  2. In Google Sheets, open a blank spreadsheet and choose File > Import, then the Upload tab, and drop in the file.
  3. Pick Replace spreadsheet (or Insert new sheet(s) to add it beside an existing month) and choose Import data.
  4. Or upload the .xlsx to Google Drive, open it with Google Sheets, and choose File > Save as Google Sheets.
  5. Click any day cell to check the dropdown (P, A, HD, L, WO, H), then set the month, year and company name at the top.
  6. Share with edit access only for the person who keeps the sheet; everyone else can view. File > Download > Microsoft Excel (.xlsx) takes it back to Excel.

Known limits of the file

  • One month per file, 15 people. Copy the sheet for the next month. For more people, copy one person's two rows (status and Late?) and fill the summary formulas down.
  • The dropdown suggests; it does not block. A typed value outside the list is kept, and only the check column shows it.
  • Holidays are copied by hand from the company calendar row to each person's row.
  • Statuses only, no punch times. The sheet records what you mark, not when anyone arrived, and has no record of approvals or regularisations.
  • No record of who changed a cell. Google Sheets keeps version history; Excel on a shared drive usually does not.
  • It counts days, not pay. Paid days and LOP go into the salary slip format, and paid leave balances live in the leave tracker.

Excel or software: where the line is

The sheet is enough while one person keeps it, everyone works one shift at one place, and nobody needs to see their own record. Move to software when any one of these becomes true:

  • More than one person edits the sheet, or managers mark their own teams.
  • People work shifts, from more than one place, or from home on some days.
  • Late marks, missed punches and regularisation requests arrive on chat and are corrected in the sheet by hand.
  • Payroll reads a cutoff window, so days move between months by hand.
  • Employees ask to see their own attendance and leave, and someone sends screenshots.

At that point HR software for a small team keeps attendance, leave and payroll on one record, and an attendance management system records each punch and writes each day's status with its reason. If none of these is true for you yet, keep the sheet.

No. 07

In LekhaHR

Every day decides itself, and says why.

LekhaHR reads punches, shifts, leave and holidays and writes each day's status with its reason. Regularisations have a cutoff, the month locks before payroll reads it, and paid days arrive in the run already explained.

30-day free trial, no card needed

Rohan Das · 16 Sep

Paiteq · day status

Status
Half day

because no half-day leave or regularisation filed before the cutoff on 20 Sep

September LOP
0.5 day

because payroll reads 26 Aug – 25 Sep

Design preview · sample data

No. 08

Questions


Statutory answers carry the date the rule took effect.

What people ask about attendance sheets.

How do I make a monthly attendance sheet format in Excel?

Download the template, set the month, year and company name at the top, and mark weekly offs and holidays on the company calendar row. Then pick a status for each person and day from the dropdown: P, A, HD, L, WO or H. The summary columns count themselves.

What is LOP in salary?

LOP, or loss of pay, is the pay deducted for days an employee was absent without paid leave. Under the Code on Wages, 2019, s.20 (in force 21 Nov 2025), the deduction may not exceed the share of the month's wages that the days absent bear to the days the employee was required to work in that wage period.

How is LOP calculated?

LOP days = A + 0.5 × HD; in the file, =COUNTIF(days,"A")+0.5*COUNTIF(days,"HD"). These templates divide by calendar days: pay = monthly rate × paid days ÷ days in the month. Whatever divisor you use, the deduction may not exceed wages × days absent ÷ days required to work, so a fixed 26-day divisor can over-deduct in a 27-working-day month.

How should holidays be marked?

Mark the holiday H on the company calendar row and on every person's row, as Mon 14 Sep (Ganesh Chaturthi) is marked here. A holiday is a paid day. The list of holidays comes from your state and your own policy, so the file ships the holiday table empty for you to fill.

Are weekly offs paid for daily-rated staff?

It depends on the state. The sheet counts WO as a payable day, which is right for monthly-paid staff. For daily-rated workers, whether the weekly off is paid is set by state law, so check your state's rules and mark an unpaid weekly off A.

Does a late mark cut pay?

Not on this sheet. Late marks are counted on their own Late? row and never change the day's status. Under the Code on Wages, 2019, s.20 (in force 21 Nov 2025), a deduction for absence is capped by the days actually absent out of the days required to work, so turning late marks into pay cuts needs care.

Does the attendance sheet work in Google Sheets?

Yes. In Google Sheets choose File > Import, upload the .xlsx and import it, or open the file from Google Drive and save it as a Google Sheet. The status dropdowns and the COUNTIF formulas carry over. Share it with edit access only for the person who keeps it.

Is the template free, and does it calculate salary?

It is a free .xlsx download, with no email and no account. It counts days: present, half days, late marks, LOP and payable days. It does not calculate pay; paid days and LOP days go into the salary slip template.

About Paiteq's September sheet

Calendar month or payroll cutoff?

The sheet counts the calendar month. Many payrolls read a window instead: Paiteq's September salary reads 26 Aug – 25 Sep. That is why Rohan's sheet shows 1 day of LOP for September while his September slip carries 0.5: his 29 Sep half day falls after the cutoff and is read in October's run.

Code on Wages, 2019 and OSH Code, 2020, in force 21 Nov 2025 · checked by the LekhaHR team, 30 Sep 2026